Close

Project – Information related to the construction of 74 km long embankment with anti flood sluice from Balagudar Ghat to Barh Sarmera Road (Puran Bigha Kondi village) on the left bank of Harohar river. Letter No. 2971 Dated 28/11/2024

Project – Information related to the construction of 74 km long embankment with anti flood sluice from Balagudar Ghat to Barh Sarmera Road (Puran Bigha Kondi village) on the left bank of Harohar river. Letter No. 2971 Dated 28/11/2024
Title Date View / Download
Project – Information related to the construction of 74 km long embankment with anti flood sluice from Balagudar Ghat to Barh Sarmera Road (Puran Bigha Kondi village) on the left bank of Harohar river. Letter No. 2971 Dated 28/11/2024 29/11/2024 View (6 MB)