About the Initiative
This portal is created as per the directions of the Hon’ble Supreme Court of India for monitoring and ensuring effective implementation of Solid Waste Management Rules, 2026 in District.
- Solid Waste & Legacy Waste Management — Patna (Patna Municipal Corporation)
- Door-to-Door Segregated Collection: In Patna district all ULB operates a dedicated Door-to-Door Waste Collection system across all 75 wards. To ensure effective separation at source and segregated transportation, waste collection vehicles are equipped with a 4-Bin system (wet/biodegradable, dry/recyclable, sanitary, and domestic hazardous waste).
- Source Segregation & Waste Processing Readiness: Patna District is conducting public awareness drives and implementing operational measures to strengthen source segregation. Once the Integrated Solid Waste Management (ISWM) facilities become operational, segregated waste streams will be routed directly to designated processing units (MRF, Compost/CBG Plant, and Waste-to-Energy facility) for maximum resource recovery.
- Bulk Waste Generators (BWGs) Compliance: Identification and registration of Bulk Waste Generators across Patna is actively underway. Eligible BWGs have been served formal notices under Solid Waste Management Rules, 2026, imparted hands-on training for registration on the CPCB Centralized Portal, and issued directions for scientific on-site processing/authorized handover of wet and dry waste.
- Dumpsite Focus — Bio-Remediation of Legacy Waste (Ramchak Bairiya): Biomining and bio-remediation of accumulated legacy waste at the identified municipal dumpsite (Ramchak Bairiya) is actively in progress, involving systematic screening, recovery, processing of various waste fractions, separation of recyclables, and scientific disposal of residual inert material under regular monitoring.
- Integrated Solid Waste Management (ISWM) Project — Infrastructure & Progress
To ensure scientific waste processing, resource recovery, and safe disposal of residual waste in Patna, district has executed the Concession Agreement for the Integrated Solid Waste Management (ISWM) Project. Preliminary preparations and site mobilization by the selected Concessionaire/Agency are underway, and project execution is scheduled to commence shortly. Key facilities proposed under the ISWM Project include:
- Waste-to-Energy (WtE) Plant: For energy recovery from high-calorific/combustible waste fractions.
- Compressed Bio-Gas (CBG) Plant: For scientific processing of organic/biodegradable waste and CBG production through bio-methanation.
- Material Recovery Facility (MRF): For systematic sorting, segregation, and recovery of dry recyclable materials.
- Compost Plant: For processing biodegradable/wet waste into quality organic compost.
- Scientific Sanitary Landfill: For safe and environmentally compliant final disposal of post-processing residual and inert waste, minimizing landfill burden.